this picture shows 30 hours worth of work since Friday morning. I started by looking for a old Harley piece that I knew I had and someone online wanted. Got bit my a spider, and could not find anything. The SSR is in the backyard on the pad under a cover.
I built ~150 sqf of shelving above for all my old car parts and house stuff. Plus another 50-60sqf going in next weekend.
The tools are all back in the box. The floor is mopped and I have fixed most of the bad electrical from the previous owner. I have the 220v done on the main box and have the wires run I jut need to drop it through conduit and connect a outlet and get the welder out of storage. The blue box is full to the brim of loose hand tools. Its going to take me a good 5-6 hours to get my box back into any type of shape.
Its going to be a month or two until I get started on the bobber but I have a line on a crashed shovel and sent a off out for a motorcycle lift that I found on craigslist.
The back shelf is getting tuned into kindling when I finalize the rest of the shelves and that's where the welding station will be.
Also I am bloody tired need a beer and to crush up and snort some ibuprofen.

