My wife would probably laugh if she read this thread, as she thinks I'll never be done with my projects and it's all self-inflicted. She's right, mostly.
I need to finish painting and prepping the control arms for the MR2, then install them. That's so I can get tires and an alignment at the same time. After that I still need to replace the leaky clutch master cyl, possibly the slave cyl, and the distributor seal that's leaking oil all over my exhaust manifold (mmmm, smells wonderful). Even then, I still need to fix my ac compressor clutch, as I picked up a used one for free from a friend. That's just the MR2.
The Integra needs a new thermostat before it gets cold out and I'm hoping a new O2 sensor(s) solve the check engine light problem. There's also a low idle on that car that'll need sorting at some point. CV boot is torn, maybe just going to wait for the joint to go out before I mess with that.
Then there's the cabinet handles that need to be put on, towel hangers that obviously need wall anchors, since they're halfway out of the wall already. SWMBO wants the fall decorations out of the attic and distributed appropriately, etc. Nothing that difficult in the house, but it adds up.
At least my lawnmower just got fixed.