Progress:
- cut 18 pieces of wood to fill the holes between rafters
- added two additional rafters on each side
- finished one side wall and
- installed side glass
Progress:
Progress today:
finsihed the left side almost. Framed all doors . Installed 16 windows
one more day - then I can start floor and drywalls for ceiling
Doors are heavy
got one installed. 3 more left.
also ran electrical for 4 lights- one outside each door - per city code
Looks great! My project for the weekend is just to clean up and reorganize the garage. Need to make an actual spot for the hardtop cart and going to make space so we can get a deep freeze to put in the garage as well. Need to build a shelf, or get some type of shelving system so I can place the chargers and batteries for the yard equipment as well.
z31maniac said:Looks great! My project for the weekend is just to clean up and reorganize the garage. Need to make an actual spot for the hardtop cart and going to make space so we can get a deep freeze to put in the garage as well. Need to build a shelf, or get some type of shelving system so I can place the chargers and batteries for the yard equipment as well.
Thank you !!
We have too much in common. Cars we own, owned previously and saw you had R6 before on another thread. I had a R1, few GSXR before moving to Ducs
My garage is organized, I am pretty OCD. But I have TOOO much garbage from all these projects - and I am slowly moving them weekly. Frustrates me to see all the garbage around, maybe 3-4 more weeks and the garbage will be gone
I had a few HT carts (miata and s2000). Sold them as I run with HT all the time that the carts were wasting space .
I have a Shed in the back for yard stuff. My garage has a regular fridge and a stand-alone freezer
good luck with the weekend projects !!
Progress:
tomorrow:
dculberson (Forum Supporter) said:Dude that's one heck of a sun room you have there. It's really looking great.
Thank you sir :) Plan is to Start insulation and drywall roof next week, then tile floor, hopefully use the room in 2 weeks
Big thanks to SVreX for his recommendation of Drywall and insulation for the sunroom roof. Picked up all material, will install first thing tomorrow, and get started on the work. Its supposed to be 80F all week, so it will be nice to work outside.
Wow. I’ve been impressed with this project from the start, and it just keeps getting better. I hope my wife never sees this thread.
Boost_Crazy said:Wow. I’ve been impressed with this project from the start, and it just keeps getting better. I hope my wife never sees this thread.
Thank you kindly. Didn't get much progress today, as will start the ceiling tomorrow.
Did paint the sink that was in patio previously, now in the sunroom to a proper colour .
Sigh . This is why I tell all my friends not to get married
first rain creates the delay. I want to do my sunroom roof and floor and be done, yet wife thought of 3 more projects to add:
SIGH
so started working on the windows today
Windows all done.
Did my best on the mailbox . Will cut all the trees at base today.
start drywall and insulation sunroom today!
Yeah, this is great! I'm sure you saw my thread the other day about garage organization. The way you're killing this project helps motivate me.
In reply to golfduke :
Thanks!
the insulation got delivered this morning
so gonna be 3 days of hard labor
z31maniac said:Yeah, this is great! I'm sure you saw my thread the other day about garage organization. The way you're killing this project helps motivate me.
Glad I am being useful ! Hehe
saw your thread. You can do it !!!
my cars all getting neglected
but house getting done
wife happy
haha